Short, medium, and long-term mining planning
Design and optimization of ore/waste rock excavation plans and dams/tailings
Advanced mastery of Deswik CAD And Deswik Scheduler for modeling, sequencing and mining schedule
Analysis of volumes, excavation constraints and integration with production objectives